Projects

Please Check Out Our Projects Here

Utilities

  • Cameron Chemical Corp project includes excavating, loading, transporting, and disposing of 85 cubic yards of contaminated soil.
  • Drain, dismantle, and recycle 70,000 lbs substation transformer.
HEI-HECO-Waiau-power-plant-overview1
image-4

Civil Defense

  • Pump out 65 drums of diesel fuel oil and water mixtures. Package into new containers and dispose of all new items.

State Of Hawaii

  • Turn-key used oil management services to collect and recycle. Supply 15 sites with new double-walled secondary containment oil tanks and various supplies.

Airlines

  • Management and EPA compliance services on hazmat-related materials. Packaging, transporting, and disposing of hazardous waste, electronic items, batteries, and used oil regulatory compliance.
United-777-delay_1
fm=f_101

Construction And Testing

  • Identification and testing of unknown drums. Packaging, shipping, and disposal of contaminated sludges and oily debris.